Scope of Work
Conceptual and Basic Engineering, Detailed Design and Procurement assistance for 30,000 BOPD oil gathering and processing facilities.
The scope of services also includes procurement co-ordination, inspection, construction, commissioning and Start-up Services.
Details
Type : 30,000 BOPD Onshore Oil Gathering and processing Plant
Facilities Separation, Treaters, flaring, Heating medium,hot water injection and Power Generation
Date of Award : May 2008
Date of Completion : June 2009
Scope of Work
The Scope of Work includes :
Details
Type : Onshore Gas Terminal
Date of Award : January 2017
Date of Completion : November 2017
Scope of Work
Details
The scope of work also includes Modifications in the existing BLNG Plant for tie-ins and performing site visits to optimise the tie-ins.
Type : Onshore LT Gas Separation Plant
Facilities : LT Separation and Metering
Date of Award : May 2008
Date of Completion : December 2009
Scope of Work
Details
1. Hydrate Formation Study
2. Installation of Potable Water Maker System
3. Installation of PCV for Slug Catcher Gas Outlet
4. Marginal Field Development Conceptual Study
5. Design of Ware House
6. Design of Workshop
7. Hypo-chlorinate Injection System
Type : Onshore GasTerminal, Raageswari Field
Facilities : LT Separation and Metering
Date of Award : April 2010
Date of Completion : April 2012
Scope of Work
Details
1. Modification of Mangala Train – 1
2. Tie-in within existing Mangala Train -1
Type : Onshore Oil and Gas Processing Plant,Mangala Field
Date of Award : January 2010
Date of Completion : March 2011
Scope of Work
Details
Design reviews, project planning, progress monitoring and expediting vendor documents for the Onshore Receiving Terminal, Gas pipelines and Offshore platform.
Type : Onshore Gas Receiving Plant, PY-1 Field
Date of Award : January 2008
Date of Completion : May 2010
Scope of Work
Details
Design and Detailed Engineering Services for:
1. Flare Tripod Jacket Structure
2. Flare Tripod Topside
3. Flare Tower
4. Risers
5. Flare Bridge
Type : O3 – Leg Tripod Flare Platform
Water Depth : 35 metres
b>Facilities :Flare KOD and Flare Tower
Date of Award : April 2007
Date of Completion : November 2008
Scope of Work
Details
Service Contract for Detailed Design and Engineering Services for:
1. Jacket Docking Analysis
2. Jacket Load-out Analysis
3. Jacket Upending Analysis
4. In-place and Fatigue Analysis
5. As-Built Weight Control Report Preparation
Type : 4 – Leg Wellhead Platform
Water Depth : 34 metres
b>Facilities :Unmanned, Minimum Facilities
Date of Award : Feburary 2007
Date of Completion : August 2008
Scope of Work
Details
Basic and Detailed Engineering Design for 4 nos. of wellhead platform structural design.
Scope of work also includes fabrication assistance at jacket and topside fabrication yard
Type : HI, HJ, HSC – 12 slots, 4 legged jackets with skirt piles. B134A – 3 slots, 4 legged jackets with main piles
Water Depth : 48 - 70 metres
b>Facilities :Test Separator and launchers
Date of Award : April 2007
Date of Completion : December 2008
Scope of Work
Details
Design and Detailed Engineering for 3 numbers additional well slots on existing Lakshmi A and Lakshmi B Platforms.
Scope of work also includes preparation of fabrication drawings, fabrication inspection, construction supervision services and preparation of “As-Built” documentation.
Type : 6+3 slots, 4 legged jackets with main piles
Water Depth : 18 - 22 meters
b>Facilities : Flow lines and launchers
Date of Award : August 2007
Date of Completion : March 2009
Scope of Work
Details
Detailed Design and Engineering for the installation of Nitrogen Injection Facilities for activation of well.
Detailed Design and Engineering for Water Injection Facilities modification.
Type : FPU
Water Depth : 70meters
b>Facilities :Separation and offloading
Date of Award : March 2008
Date of Completion : May 2009
Scope of Work
Details
Engineering Service Contract for the Modification and de-bottlenecking existing process systems, like:
1. Improvement of Mechanical Handling system
2.Glycol Vent Modification
3. Installation of additional Life Boat
4. Flare and Blowdown Study
5. Filter Separator Performance up-grade>
6. Condensate Stabilizer Performance up-grade
7. Metering Station Vibration Study
8. Updation of Operating Manuals
Type : Offshore Process Platform
b>Facilities :Separation and offloadingOil and Gas Separation, stabilization, compression and export
Date of Award : January 2009
Date of Completion : ONGIONG...
Scope of Work
Details
To perform Structural Integrity Check for existing platform Top Side by carrying-out Inplace analysis and Global analysis.
Type : Offshore Well Head Platform
b>Facilities :Minimum Facilities
Date of Award : August 2009
Date of Completion : ONGIONG...
Copyright © 2017 Designed by : petro6.