info@petro6.com |

Major Projects

Project Detailed Design and Engineering of LT Separator Trains and Fiscal Metering Station Piping Design.
Facilities LT Separation and Metering
The Scope of Work includes
  • Modifications in the existing BLNG Plant for tie-ins and performing site visits to optimise the tie-in locations.
Type Onshore Gas Terminal
Year of Award 2008
Year of Completion 2009



Back To Major Projects