The Scope of Work includes |
- All Engineering and Detailed design work and Construction support of DQUM Bunker Terminal as per the contract specifications. The terminal facility includes 2 Marine gas oil tanks (MGO), 2 Intermediate Fuel Oil Tanks (IFO), transfer pumps, Switch gear building, control stations, site plot plan, Terminal layouts and pipeline upto loading/unloading terminal in Jetty.
- Fuel Oil storage Tank Size - 26m dia and 20m height, 5400m3 Capacity
- Marine gas Oil storage Tank size - 20m dia and 17m height, 10600m3 Capacity
- The scope also includes carrying out Value Engineering to reduce the cost of the project while fulfilling all code and local requirements.
- 3D Model Development
- Material Requisition and Technical Bid-Evaluation (MR & TBE)
- Construction assistance and As-Built drawing preparation
- HAZID / HAZOP Study and Closeout
|